-
Building an internal network infrastructure for 46 buildings, including a central command and control unit.
-
Supply and installation of low-current systems such as a fire alarm system (4500 points), public address system, master clock system, CCTV system, MATV and Video Wall systems, and gas detection system.
-
Project Duration: 6 months Maintenance Duration: 1 year
-
Execution year: 2018
-
End of Maintenance:2019